Raypak 009832 D-2 Power Vent Kit (Mechanical Draft) – 120/240V – For Raypak Digital IID Heaters 206A–267A
The Raypak 009832 is a factory D-2 Power Vent (mechanical draft) kit designed for compatible Raypak Digital IID pool and spa heaters in the 206A–267A size range. It replaces the standard draft hood and provides fan-assisted exhaust for approved Category III positive-pressure venting, including through-the-wall and multi-position venting configurations when installed per Raypak instructions and local code.
Key Features
- Part Number: 009832
- Type: D-2 Power Vent (Category III mechanical draft / positive pressure)
- Voltage: Dual voltage 120/240 VAC (factory set for 240V; field-rewireable for 120V)
- Exhaust Connection: 4″ vent outlet
- Multi-position venting: Supports common discharge orientations (including sidewall venting when permitted)
- Draft safety: Includes a draft-proving switch to verify blower operation before heater operation
- Post-purge control: Helps clear residual combustion gases after shutdown (control features vary by revision)
- Venting capability: Commonly rated for vent runs up to 100 equivalent feet when installed per the venting manual
Typical Compatibility
- Raypak Digital IID heaters in the 206A–267A size range (confirm exact model and revision)
- Important: Always verify fitment by your heater model/serial and the correct Raypak parts diagram before ordering.
Common Reasons to Replace
- Blower motor is noisy, seized, or will not start
- Draft-proving faults traced to the vent assembly
- Corrosion or physical damage to the plenum/cabinet
- Converting a compatible installation from a draft hood to a factory power-vent configuration (where allowed)
Installation Notes
- Combustion venting is safety-critical: Install per Raypak instructions and local codes. Professional installation is recommended.
- Use approved Category III vent materials: Positive-pressure venting typically requires sealed vent pipe/fittings rated for Cat III use.
- Verify electrical: Confirm site voltage and wiring configuration (factory set for 240V; field conversion to 120V requires proper rewiring).
- Confirm clearances: Follow required distances to openings, windows, and combustibles at the termination point.
Related Products
- Search: Raypak 009832
- Search: Raypak Power Vent Kits & Parts
- Search: Raypak Draft Proving / Pressure Switch
- Search: Raypak Blower Motor
- Search: Raypak 206A Parts
- Search: Raypak 267A Parts
- Search: 4″ Category III Venting
Installation & Maintenance Tips
- Inspect the vent termination area regularly for nests, leaves, and debris that can restrict exhaust flow.
- Check the vent joints and supports periodically—positive-pressure systems must remain sealed and properly supported.
- If the heater locks out on draft-related faults, shut down and inspect the vent run, termination, and combustion air supply before restarting.
- Keep the equipment area clean and dry; corrosion and moisture intrusion can shorten blower and switch life.
- Maintain proper water flow and filtration—low flow and overheating can contribute to premature heater component wear.









